- February 13, 2015
For this project we worked with OPI commercial builders, the GC doing a build out for the BAE San Jose office. We were given design guidelines to follow to stay within BAE’s corporate standard. Fabrication time was about 7 business days. Materials used include acrylic- surface paint and sub surface paint, 3M dusted crystal vinyl film, and aluminum standoffs. The client was pleased with the results and we have since produced two exterior signs for the location.