- June 26, 2015
In Spring 2015, Bennett Graphics replaced all the signs at the Ross LA buying office. When the facilities manager came to us, Ross had a new sign program but wanted to change vendors. We started by visiting their new office in Dublin to do a site survey. Detailed notes and measurements were taken to ensure the signs matched. Once the designs were correct, we flew to LA to do a site survey. Based on information from site survey and floor plans, we were able to determine signs needed be ADA compliant. Fabrication of the 275 signs took about 6 weeks. Materials used included P95 acrylic, subsurface paint, green glass acrylic with polished edges, aluminum accent rules, Rowmark tactile letters, stainless steel raster beads, and magnetic discs to hold changeable inserts in place. The installation took place over 2 days.